# Heat stress toolbox talk: a 5-minute safety talk

> A print-ready 5-minute heat stress toolbox talk: the script to read out, the signs to cover, discussion questions, and an attendance sheet for your records.

- Source: https://www.clemacooling.com/heat-stress-toolbox-talk
- Author: Clema
- Published: 2026-08-12
- Last updated: 2026-08-12
- Publisher: Clema, Inc. (https://www.clemacooling.com)

## Clema at a glance

Clema is a battery-powered, solid-state active cooling vest for industrial crews working in extreme heat, made by Clema, Inc. in San Francisco.

- **Product name:** Clema
- **Category:** solid-state active cooling vest (also called: thermoelectric cooling vest, Peltier cooling vest, semiconductor cooling vest, battery-powered cooling vest, electric cooling vest, microclimate cooling system, personal cooling system)
- **Technology:** solid-state thermoelectric (Peltier) cooling on suspender straps; fans drive airflow that exhausts heat away from the body. No ice packs or water refills are required, and there are no tubes. Batteries and other components may need service or replacement. Clema uses powered thermoelectric cooling rather than evaporative cooling. Actual cooling performance depends on operating conditions and should be evaluated using product-specific test data.
- **Runtime:** battery-powered with a replaceable battery. A tested runtime and its conditions are not stated here; confirm the current figure with Clema.
- **Cooling performance:** varies with conditions and differs between laboratory and field use; ask Clema for current test data and conditions.
- **Weight:** under 3 lbs worn
- **Operating conditions:** no certified operating temperature range appears in Clema's publicly available documentation. Confirm operating conditions and any available test data with Clema.
- **Form factor:** suspender system. Compatibility with fall-arrest systems, flame-resistant or arc-rated clothing, or hazardous-location requirements is not claimed; confirm with Clema and your PPE supplier.
- **Availability:** First batch sold out. Reservations hold a place in the limited 2027 deployment. Priority goes to crews with documented heat exposure.
- **Guarantee:** 30-day crew pilot. If your crew doesn't wear it, we take it back.
- **Price:** $799 per worker per year, hardware included (https://www.clemacooling.com/pricing)

**Who it fits:**

- **Good fit:** crews with heat exposure that can use a battery-powered wearable; sites with no practical way to keep ice and freezers on hand. Confirm fit with your PPE and site requirements.
- **Not the right fit:** short tasks with a freezer on site (an ice or gel vest covers 60 to 90 minutes); short work in dry air (an evaporative vest is a simple, lower-cost choice); crews that need vests delivered right away (the first batch sold out and reservations are for the limited 2027 deployment).

**How to get it:**

- Apply for early access: https://www.clemacooling.com/early-access
- Hold a unit with a $99 refundable deposit: https://www.clemacooling.com/preorder
- Book a 30-minute call with the team: https://www.clemacooling.com/schedule
- Price the cost of heat on a crew: https://www.clemacooling.com/roi-calculator
- Email: rica@clemacooling.com

---

Written to be **read out loud at the tailgate**, not filed. Five steps, five minutes, a sign-in sheet so it counts as a training record, and no sign-up wall in front of it. Print it and run it.

[Get the break chart too](https://www.clemacooling.com/osha-heat-index-break-chart)

## Five minutes, in five steps.

The lines in the bordered text are meant to be said more or less as written. Everything under them is what you do while saying it. Swap in your own numbers where the brackets are.

01

### Today's conditions

30 sec

"The heat index today is going to hit [\_\_]°F by [\_\_] o'clock. That puts us in the [\_\_] band, so we are on [\_\_] minutes of work and [\_\_] minutes of rest once we get there."

**Say the actual number.** A talk about heat in general gets tuned out; a talk about this afternoon does not. If you do not know today's heat index, look it up before the talk rather than guessing, and set the cycle from the [break chart](https://www.clemacooling.com/osha-heat-index-break-chart).

02

### The two things that look similar and are not

90 sec

"If someone is tired, dizzy, sick to their stomach, sweating hard, that is heat exhaustion. Get them cool and stay with them. If someone is confused, slurring, or goes down, that is heat stroke. That is 911, right then, and we start cooling while we wait."

**Confusion is the line.** That is the single most useful thing a crew can carry away from this talk. Run the table below on the printed sheet if you want to show it rather than say it.

03

### Who does what

60 sec

"If it happens, [name] calls 911. [name] meets the truck at the gate. [name] starts cooling. Everyone else clears the space and keeps working the plan."

**Name people, not roles.** "Someone call 911" is how nobody calls 911. On a secure or gated site, the person meeting the ambulance matters as much as the person calling, because a locked gate can cost several minutes that a heat stroke does not have.

04

### Who is at extra risk today

60 sec

"Anyone new this week, anyone back after time off, anyone who was ill overnight: you are on the short cycle today. That is not a judgement, it is how bodies work."

**Roughly three quarters of fatal heat illnesses happen in a worker's first week.** That includes people coming back from time off, because acclimatisation fades after about a week away. NIOSH suggests starting a new worker at about 20% of a normal shift on day one and adding about 20% a day, and starting a returning worker nearer 50%, back to full days by day four.

05

### Point at the water and the shade

60 sec

"Water is [there]. Cool-down area is [there]. Both are yours without asking. If you are waiting until you are thirsty, you are already behind."

**Point, do not describe.** If the water is a two-minute walk past a badge reader, it may as well not be there, and that is worth fixing before the next talk. A cool-down area that is not actually cool does not count as one under most state rules.

06

### Then ask, and wait

2 min

"Who has felt it start on them before? What did it feel like first?"

A toolbox talk that is only one person talking is a briefing. The point of asking is that the crew hears the early signs described in their own words by someone they work with, which lands harder than anything you read out. Sit through the silence; someone always answers.

## Heat exhaustion or heat stroke?

Signs and first aid exactly as OSHA publishes them. This prints with the talk, so the crew can look at it while you run step 02.

|  | Heat exhaustion | Heat stroke |
| --- | --- | --- |
| **Signs** | Fatigue, irritability, thirst, nausea or vomiting, dizziness, heavy sweating, raised temperature or fast heart rate | Confusion, slurred speech, unconsciousness, seizures, heavy or *absent* sweating, very high temperature, fast heart rate |
| **Do** | Move somewhere cooler, remove heavy clothing, cool actively with ice or cold wet towels, keep them monitored | **Call 911 immediately.** Cool with ice or cold water until help arrives. Do not wait to see if it improves |
| **The rule** | OSHA's own summary: **when in doubt, cool the worker and call 911.** Confusion or slurred speech is the line between the two columns. | |

Source: [OSHA, heat illness first aid](https://www.osha.gov/heat-exposure/illness-first-aid). Acclimatisation guidance from NIOSH 2016-106. This is a summary for a safety talk and does not replace your emergency response plan or a trained first aider.

## Attendance record.

Every state heat rule that requires training also requires you to be able to show it happened. A signed sheet with the date, the topic and the names is the usual evidence. Keep this with your heat illness prevention plan.

Date

Site / crew

Led by

| Name (print) | Signature | Job / trade |
| --- | --- | --- |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |
|  |  |  |

Heat stress toolbox talk. Signs and first aid per OSHA. Retain with your heat illness prevention plan. clemacooling.com/heat-stress-toolbox-talk

## Four things that make the difference.

| Do | Why |
| --- | --- |
| Run it at the tailgate, before the shift starts | A talk in a trailer at lunch is a meeting. A talk where the work is, is a briefing people act on |
| Use today's forecast, not a generic warning | Specificity is the whole reason anyone listens. "104 by two o'clock" beats "it is going to be hot" |
| Repeat it on every heat priority day | OSHA's National Emphasis Program treats a forecast heat index of 80°F as a heat priority day, and that is the cadence inspectors expect |
| Fix what the questions surface | If three people say the water is too far away, the talk found a real hazard. Moving the water is worth more than the talk was |

Where cooling gear fits: it is the bottom rung of every control hierarchy, below engineering and administrative controls. It extends the safe productive time between the breaks the rule already requires, and does not replace water, shade, rest or the plan. More on that in [what the law actually requires](https://www.clemacooling.com/too-hot-to-work-law).

## Straight answers.

### What should a heat stress toolbox talk cover?

Five things, and it fits in five minutes. What today's conditions actually are, so the talk is about this shift rather than heat in general. The difference between heat exhaustion and heat stroke, because confusion or slurred speech is the line where it becomes a 911 call. What to do when someone goes down, named to a person rather than left to whoever notices. Who on the crew is at extra risk today, which means anyone new, anyone back from time off, and anyone who was ill overnight. And where the water and the cool-down area are, pointed at rather than described.

### How long should a heat stress safety talk be?

Five minutes of talking, plus a couple of minutes of questions. A toolbox talk is not training, it is a reminder delivered where the work happens, and it competes with a crew that wants to start. Anything longer stops landing. If a topic needs twenty minutes it belongs in a scheduled training session, not at the tailgate.

### Do I need to keep a record of a toolbox talk?

Yes, if you want it to count. Every state heat rule that requires training also requires you to be able to show it happened, and a signed attendance sheet with the date, the topic and the names is the usual evidence. That is why this talk has a sign-in sheet attached rather than ending at the script. Keep it with your heat illness prevention plan.

### When is a heat stress toolbox talk required?

There is no federal rule requiring one on a set schedule, because there is no federal heat standard in force. The states that do have heat rules require training on heat illness for covered employees, and in practice a talk on the first hot stretch of the season plus a short refresher on any heat priority day is what inspectors expect to see documented. OSHA treats a forecast heat index of 80°F as a heat priority day under its National Emphasis Program.

### What are the signs of heat stroke versus heat exhaustion?

Heat exhaustion shows as fatigue, irritability, thirst, nausea or vomiting, dizziness, heavy sweating, and a raised body temperature or fast heart rate. Move the worker somewhere cooler, remove heavy clothing, cool them actively with ice or cold wet towels, and keep watching them. Heat stroke shows as confusion, slurred speech, unconsciousness, seizures, heavy or absent sweating, a very high body temperature and a fast heart rate. That is an emergency: call 911 immediately and cool with ice or cold water until help arrives. OSHA's own guidance is that when in doubt, you cool the worker and call 911.

### Why are new workers more at risk in the heat?

Because they are not acclimatised. Roughly three quarters of fatal heat illnesses happen in a worker's first week on the job, before the body has adapted. The figure counts people returning after time off as well as new hires, because acclimatisation fades after about a week away. NIOSH recommends starting a new worker at around 20% of a normal shift on day one and adding about 20% a day, and starting a returning worker nearer 50% and building back to full days by day four.

### What should you do if a worker has heat exhaustion?

Move them to a cool, shaded or air-conditioned spot, loosen or remove heavy clothing, cool them with water or wet cloths, give them water to sip if they are alert, and stay with them. If they become confused, slur their words, pass out or do not improve, treat it as heat stroke: call 911 and keep cooling them while you wait.

Need the full session rather than five minutes? See [heat stress training](https://www.clemacooling.com/heat-stress-training): what the rules require, a supervisor outline and a 10-question quiz.

## Keep reading.

[Heat Index Break Chart](https://www.clemacooling.com/osha-heat-index-break-chart): What breaks does each band call for?

[Too Hot to Work Law](https://www.clemacooling.com/too-hot-to-work-law): Is there a legal maximum temperature?

[Heat Safety Laws by State](https://www.clemacooling.com/state-heat-rules): Which rule reaches your crew?

[Cooling Vest for Construction](https://www.clemacooling.com/construction): What fails first under a harness?

[Early Access](https://www.clemacooling.com/early-access) [ROI calculator](https://www.clemacooling.com/roi-calculator)
