ANSI/ASSP A10.50-2024 is the construction industry's playbook for working safely in heat. Here is what it says, when each step kicks in, and how it compares with OSHA. No jargon. Last updated .
ANSI/ASSP A10.50-2024 is a safety standard that tells construction and demolition employers how to protect workers from heat. Safety experts wrote it, not the government, so following it is voluntary.
It works like a ladder. As it gets hotter, you climb from one heat level to the next, and each level adds more protection.
A best-practice standard, not a law. It becomes required only if a contract or your company adopts it.
Written for construction and demolition. ASSP says other outdoor jobs can adapt it.
Action, moderate and extreme. Each one adds more protection.
Published by the American Society of Safety Professionals (ASSP) after 3 years of work by 30 experts.
Full name: ANSI/ASSP A10.50-2024, Standard for Heat Stress Management in Construction and Demolition Operations. It is a paid document, sold by the ASSP store and the ANSI Webstore. We don't copy its text. This guide sums it up from ASSP's announcement and OSHA's published comparison (89 FR 70765 and 71040 to 71042).
Type in a reading from your site. The tool shows which A10.50 level you're at and what the standard calls for.
WBGT counts air temperature, humidity, sun and wind. It's the more accurate reading for work.
Heavy clothing traps heat, so A10.50 adds it to the WBGT. These are the OSHA and NIOSH values from our WBGT guide. Your copy of A10.50 may list its own.
82°F WBGT + 0°F for clothing = 82°F
This tool is a guide, not legal advice. Heat levels come from OSHA's summary of A10.50 (89 FR 71041). Always check your copy of the standard and your state's heat rule.
A10.50 gives two ways to read the heat: a WBGT meter, or the heat index. Each has its own numbers. Use the column that matches how you measure.
| Heat level | WBGT (clothing added) | Heat index (sun added) | What to do |
|---|---|---|---|
| Action level | 70°F | 80°F | Set up shaded rest areas with water. Required. |
| Moderate hazard | 80°F | 95°F | Add scheduled rest breaks. Recommended. |
| Extreme hazard | 87°F | 110°F | Stop hard, heavy physical work. Recommended. |
At every level: cool, free water close to the work, and plenty of it. For heavy work lasting more than 2 hours, electrolyte drinks too.
Don't mix the two scales. WBGT numbers run lower than heat index numbers, so never check a WBGT reading against a heat index number. Learn more in our WBGT guide. Source: 89 FR 71041.
Think of A10.50 as a heat plan with named people in charge. Here are the pieces, in plain words. The small blue label shows the term the standard uses.
How you'll measure heat, control it, and handle an emergency. Start from our plan template.
Heat stress management programEase new and returning workers into hot work. See our acclimatization schedule.
Acclimatization planA trained person who checks each task for heat risk.
Competent personSomeone with the credentials or deep experience to help build the plan, read WBGT and plan for emergencies.
Qualified personCool, free water close by, always. Electrolyte drinks for heavy work over 2 hours.
HydrationShaded rest areas from the action level up. Scheduled breaks are recommended at the moderate level.
Rest and shadeWorkers watch each other for signs of heat illness.
Buddy systemMedical checks for workers, like a health history, a physical, and personal risk factors.
Medical surveillanceNever leave a sick worker alone or send them home without first aid. With no medic on site, someone must be CPR and AED certified.
Emergency action planA written list of local conditions that make heat worse, like hot equipment or no shade.
RecordkeepingFix the site first, then the schedule, then use cooling gear. See how.
Hierarchy of controls


A10.50 follows what safety pros call the hierarchy of controls. Start by changing the site. Then change how the work gets done. Personal cooling gear comes last.
Air conditioning, barriers that block radiant heat, cooling and air movement, misting fans, and machines that take on the heavy lifting.
Move hot work to cooler times of day, and let workers set their own pace.
Cooling vests and other personal cooling gear, on top of steps 1 and 2.
Most effective first ↓ last line of defense

A cooling vest never replaces water, shade or rest. It helps when the work can't move into the shade or to a cooler hour, like roof decks, steel, or harness work at midday.
OSHA's worry is cooling gear that runs out mid-shift and starts trapping heat. Its proposed rule says that if you hand out cooling gear, it has to keep cooling the whole time it's worn. So write down how long it lasts, when it gets swapped or recharged, and who checks.
Clema makes a battery-powered cooling vest with a swappable battery. No ice, no water, no refills. More detail in Does OSHA require cooling vests?
OSHA proposed a federal heat rule in August 2024. Before writing it, OSHA compared it with A10.50 and found that many parts match. Here is where they differ. Tap a filter to narrow the list.
| Topic | A10.50 (2024) | OSHA proposal (2024) |
|---|---|---|
| Is it the law? | No. Voluntary, in use since 2024. | Not yet. Still a proposal. See the latest status. |
| Who it covers OSHA asks more | Construction and demolition. | Almost all employers: general industry, construction, maritime and farming. |
| Measuring heat A10.50 asks more | WBGT or a similar index that counts clothing, checked by a trained heat lead. | Heat index or WBGT. Outdoors, a local forecast is enough. |
| Heat levels A10.50 asks more | Three: 80°F, 95°F and 110°F adjusted heat index (or 70, 80 and 87°F WBGT). | Two: 80°F and 90°F heat index (or WBGT at NIOSH limits). |
| Water and shade About the same | Cool, free water. Shade from the first level. | Cool, free water. Shade from the first level. |
| Rest breaks OSHA asks more | Recommended at the moderate level. | Required when needed, and 15 minutes every 2 hours at 90°F. |
| Electrolytes A10.50 asks more | Required for heavy work over 2 hours. | Not required, but allowed. |
| Health checks A10.50 asks more | For all covered workers. | None. |
| CPR and AED A10.50 asks more | A certified person on site if there is no medic. | No certification required. |
| Cooling gear | Last step, after site and schedule fixes. | Not required. If you give it out, it must keep cooling the whole time it's worn. |
| Who's in charge | A heat lead (competent person) and an expert (qualified person). | One or more heat safety coordinators. |
| Records | A written list of site conditions that make heat worse. | Indoor heat readings, kept 6 months. |
| Alerts and signs OSHA asks more | Not included. | Heat alerts to workers at 90°F, and warning signs where indoor areas often top 120°F. |
Source: OSHA's proposed heat rule, 89 FR 70698 (Aug. 30, 2024), section X.E, Consensus Standards.
ASSP publishes A10.50.
OSHA proposes a federal heat rule and compares it with A10.50.
OSHA holds public hearings.
Public comments close.
Updated proposal scheduled.
Final rule scheduled. Dates like these often slip.
Sources: OSHA heat rulemaking page and the federal regulatory agenda (RIN 1218-AD39).
Not by law. But it may still apply to you, and it's a clear picture of what a solid construction heat program looks like.
No final federal heat rule yet. OSHA can still cite heat hazards under the General Duty Clause, and it runs a heat inspection program.
California, Washington, Oregon, Maryland, Nevada, Minnesota and Colorado have their own heat rules. Those are the law. A10.50 sits on top. Check your state.
Owners and general contractors can write A10.50 into a contract. Then everyone on that job has to follow it.
Safety standards like A10.50 show what the industry sees as a known hazard, and what a workable fix looks like. That matters if OSHA ever looks at a heat incident on your site.
A10.50 also goes further than OSHA's proposal in places, like health checks, CPR-certified first aiders and electrolyte drinks. A crew that follows it already covers most of what OSHA's proposal would add.

Tick each step as you finish it. Your progress is saved in this browser only.
Other A10 standards that pair with A10.50: A10.33 (safety programs on multi-employer projects), A10.38 (basics of an employer safety program), A10.26 (emergency procedures for construction sites), A10.25 (sanitation in construction) and A10.2 (safety training). See the full ANSI/ASSP A10 series.